Brother BAS-300G Owner's Manual

Page of 44
3. INSTALLATION 
 
BAS-300G, BAS-311G, BAS-326G 
12 
3-9. Connecting the cords 
1.  Gently tilt back the machine head. 
2.  Pass the cord bundle through the hole 
in the work table. 
3.  Loosen the two screws (1), and then 
open the cord presser plate (2) in the 
direction of the right arrow and pass 
the cord bundle through the opening. 
4.  Securely connect the connectors as 
indicated in the table below. 
 
NOTE: 
• Check that the connector is facing 
the correct way, and then insert it 
firmly until it locks into place. 
• Secure the cables with cable ties 
and cord clamps, while being careful 
not to pull on the connector. 
 
 
 
 
 
 
<Main PCB> 
NOTE: 
•  Check that the connector is facing the correct 
way, and then insert it firmly until it locks into 
place. 
• Secure the cables with cable ties and cord 
clamps, while being careful not to pull on the 
connector. 
 
*
:  Be sure to make the ground connection.   
(Refer to "3-10. Connecting the ground 
wire".) 
 
 
 
 
 
 
 
 
 
 
 
 
 
Connector 
Connection location on 
main PCB 
Cord clamp 
X pulse motor encoder 5-pin white 
P20 (X-ENC) 
(3) 
Y pulse motor encoder 5-pin blue 
P4 (Y-ENC) 
(3) 
Work clamp pulse motor encoder 5-pin black 
P5 (P-ENC) 
(3) 
Foot switch 10-pin 
P6 (FOOT) 
(3) 
Operation panel 8-pin 
P1 (PANEL) 
(3) 
Machine head switch 3-pin 
P9 (HEAD-SW) 
(4) 
Home position sensor assembly 12-pin 
P8 (SENSOR1) 
(4) 
STOP switch 6-pin 
P13 (HEAD) 
(4) 
Valve harness 12-pin (pneumatic work clamp 
specifications)
 
P12 (AIR1) 
(4) 
Programmer relay harness 8-pin 
P7 (PRG) 
(3) 
Solenoid selection harness 4-pin 
P3(CUTTER) 
 
 
(Continued on next page) 
 
4924Q
Lock the cord 
clamp securely.
1842B