Maxtor 10K III User Manual

Page of 284
Installation
Maxtor Atlas 10K III 3-13
Configure the desired spin up option (Table 3-3) by setting the state of the 
DELAY_SPIN (Pin 38) and STAGGER_SPIN (Pin 78) inputs on the 80-pin SCA-
2 connector (Figure 3-5). The states of these signals are set by using either hard-
wired connections at the backplane or backplane logic. 
12$$
Spin Up on Power On Options
$3%3$3%
)*@*5 "?++)+<(*+(
The drive provides the output BUSY_OUT signal to power a user-supplied activity 
LED. 
The output indicates the drive is performing a SCSI operation. To use this output, 
connect a user-supplied LED cathode to the BUSY_OUT connection, pin 77 on 
the SCA Connector (Figure 3-5). The LED anode must be attached to the proper 
+5 VDC supply through an appropriate current-limiting resistor.
Option
STAGGER_SPIN (Pin 78)
DELAY_SPIN (Pin 38)
 – Spin Up When Power is Applied
Open
Open
 – Spin Up After Delay 
Ground
Open
 – Spin Up on START Command
Open
Ground
Reserved
Ground
Ground