DELL ML6000 User Manual

Page of 68
Dell PowerVault ML6000 Getting Started Guide
19
Powering On the Library
1 Turn on each power supply’s power switch. 
2 Turn on the library’s main power using the power button located on the 
front of the 5U Library Control Module. 
The Setup Wizard screen appears on the operator panel when the library 
has completed its power-on self-test (POST) and initialization. This 
process takes approximately 30 minutes. Do not power off the library 
during this process.
1
Module terminator
2
Ethernet cable connected to Gigabit 
Ethernet port
3
Module-to-module cable
4
Power cords
APCC.book  Page 19  Tuesday, March 9, 2010  4:25 PM