Trendnet SMT1000 User Manual

Page of 18
5
Smart-UPS 750/1000/1500/2200/3000 VA  100/120/230 Vac / 500 VA 100 Vac  Tower
Operation
Connect Equipment
Note:
 The 2200/3000 VA 100 Vac model UPS will charge to 90% capacity in the first four and a half 
hours of normal operation. 
All other models will charge to 90% capacity in the first three hours of normal operation 
Do not expect full battery runtime capability during this initial charge period.
1. Connect equipment to the outlets on the rear panel of the UPS. 
2. Connect the UPS to the building utility power. 
Always connect the UPS to a two pole, three wire, grounded source.
3. To use the UPS as a master O
N
/O
FF
 switch, turn on all the equipment that is connected to the UPS.
4. Press the O
N
/O
FF
 button on the front panel of the UPS to turn on the UPS and all connected equipment.
 See “Main Outlet Group and Controlled Outlet Group” on page 10 for information on how to configure the outlet
groups.
Rear Panel Features
CAUTION
RISK OF EQUIPMENT DAMAGE
•  Adhere to all local and national electrical codes. 
•  Wiring should be performed by qualified electrician.
•  Always connect the UPS to a grounded outlet.
Failure to follow these instructions can result in equipment damage
Serial port: Connect to a computer to use power management software. 
USB port: Connect to a computer to use power management software.
Note: Serial and USB communication can not be used simultaneously.
Ground Screw: The UPS features a ground screw for connecting the ground leads 
on transient voltage devices. Prior to connecting a ground lead, disconnect the UPS 
from utility power.
s
u
04
41
a