Sharp PNSV01 User Manual

Page of 117
72
Schedule Editor
Creating a schedule
Creating a schedule
●Registering a timetable in the schedule
Timetable folder
1.  Select the timetable folder containing the timetable.
2.  Select a timetable from the “Timetable” list and click 
 
,
  or alternatively, double-click the timetable, or from the 
[Edit] menu, click [Add Timetable to Schedule].
The [Add Timetable to Schedule] dialog box will appear.
3.  Set a “Span”.
This is the length of time that the program will be played for.
Specify dates between 1/1/2005 and 12/31/2020.
If you do not set the “Option” area, the time schedule will be
added to the entire span from “Start” to “End”.
Use the “Option” settings to add timetables to specified days
or weeks.
•  If you check the “Select the day(s) of the week below:”
check box and the “Sunday” to “Saturday” check boxes,
the timetable will only be added to the specified days of
the week during the span.
•  If you check the “Select the week(s) of the month
below:” check box and the “1st week” to “6th week”
check boxes, the timetable will only be added to the
specified weeks during the span.
•  If you specify both “Select the day(s) of the week below:”
and “Select the week(s) of the month below:”, the timetable
will only be added to days that meet both sets of conditions.
 For example, setting “Select the day(s) of the week below:” to “Wednesday”, and “Select the week(s) of
the month below:” to “2nd week”, would add the timetable to the second Wednesday of every month.
4.  Click [OK].
The timetable will be registered in the schedule.
  Timetables may also be registered by dragging 
them from the “Timetable” list to the “Calendar”.  
Registered timetables can be changed in the 
calendar. (Fp.64)
5.  Repeat steps 2 to 3 as necessary and add all the 
timetables that you want to display to the schedule.