Sharp PNSV01 User Manual

Page of 117
85
Schedule Distribution Tool
Distributing schedules
Schedules can be distributed in the following ways: 
• Distributed to a target PC via a network (Network Version only)
• Distributed to your own PC
• Distributed via USB memory or other external device
 The maximum total size of schedules (including programs and content) that can be distributed with
Schedule Distribution Tool is 2 GB. Data greater than this size cannot be distributed.
●Distributing via a network
Distribute schedules to the target PC via a network.
  These instructions only apply to the Network Version.
1.  Click [Distribute schedule or program to the panel].
The [Selection of Distribution Methods] dialog box will appear.
2.  Select the “Distribute the schedule through the network” 
option button, and click [Next]. 
The [Selection the Schedule to Distribute] dialog box will
appear.
3.  Select a schedule.
If you would like to add the selected schedule to the current 
schedule on the target PC, check the “Add this schedule on
the running schedule in the target panel” check box. If the box
is not checked, the current schedule on the target PC will be
replaced with the currently selected schedule.
  Schedule replacement is performed in units of 
days. It cannot be changed to units of hours.
4.  Click [Next].
The [Selection of the Distribution Target] dialog box will appear.
Distributing schedules