Initial Start Up 
1.  Before applying power to the system, verify that: 
• 
All sensors are mounted and connected properly. 
• 
None of the wiring or cables are shorted. 
• 
All connections follow the wiring and installation diagrams. 
• 
All monitored input signals are within specified input ranges. 
• 
Phone lines are properly connected to a phone multiplexer (if used). 
 
WARNING: Check all wiring before applying power to the unit.  Wiring 
errors can damage the device and create a safety hazard. 
2.  Connect the power input wires to the 120 V AC/DC Power terminal. 
3.  Apply power to the monitor.  
NOTE: Copyright information will be displayed for approximately 
ten seconds.  After that, the display will go blank. 
        L  T  C  -  M  A  P    2  1  3  0         
    r  e  v    2  1  3  0  .  x  x  .  y  y         
                                       
  c  o  p  y  r  I  g  h  t    (  C  )    1  9  9  7   
4.  Configure and set system parameters using the SAGE
 host software 
package. (Refer to the SAGE
 documentation for specific 
procedures.) 
5.  Upload the SAGE
 configuration files to the LTC-MAP, either through 
the RS232 Serial port or via a modem. (Refer to the SAGE
 
documentation for specific procedures.) 
6.  Verify the current date and time. 
• 
Press the 
Alarm Status & Settings
 button two times or until the 
Current Time and Current Date screen is displayed: 
 
      C  u  r  r  e  n  t    T  i  m  e  :         
          1  2  :  3  0  :  2  2               
      C  u  r  r  e  n  t    D  a  t  e  :         
    W  e  d        0  9  /  1  7  /  1  9  9  7     
 
• 
If the time and date are incorrect, reset them using the procedures 
outlined in the SAGE
 documentation. 
NOTE: The date and time must be set accurately to insure that LTC-
MAP 2130 properly acquires data.