Marvel 88F6281 User Manual

Page of 140
System Power Up/Down and Reset Settings
Power-Up/Down Sequence Requirements
                         
Copyright © 2008 Marvell
 
Doc. No. MV-S104859-U0 Rev. E
December 2, 2008, Preliminary
Document Classification: Proprietary Information
Page 63
6
System Power Up/Down and Reset 
Settings
This section provides information about the device power-up/down sequence and configuration at 
reset.
6.1
Power-Up/Down Sequence Requirements
6.1.1
Power-Up Sequence Requirements
These guidelines must be applied to meet the 88F6281 device power-up requirements:
„
The non-core voltages (I/O and Analog) as listed in 
level before the core voltages reach 70% of their voltage level.
The order of the power-up sequence between the non-core voltages is unimportant so long as 
the non-core voltages power up before the core voltages reach 70% of their voltage level 
(shown in 
The order of the power-up sequence between the core voltages (VDD and VDD_CPU) is 
unimportant.
„
The reset signal(s) must be asserted before the core voltages reach 70% of their voltage level 
(shown in 
„
The reference clock(s) inputs must toggle with their respective voltage levels before the core 
voltages reach 70% of their voltage level (shown in 
).
„
If VHV is set to burning mode (2.5V), which is a higher voltage than the VDD voltage, VDD must 
be powered before VHV, to prevent the fuse from being accidentally burned.
                         
Table 31: I/O and Core Voltages
N o n - C o r e   Vo l ta g e s
C o r e   Vo l ta g e s
I / O   Vo l ta g e s
A n a l o g   P o w e r   S u p p l i e s
VDD_GE_A
VDD_GE_B
VDD_M
VDDO
CPU_PLL_AVDD
CORE_PLL_AVDD
PEX_AVDD
RTC_AVDD
SATA0_AVDD
SATA1_AVDD
SSCG_AVDD
XTAL_AVDD
USB_AVDD
VDD
VDD_CPU