LevelOne FSW-0809 User Manual

Page of 16
Installation 
The setup of the Switch can be performed using 
the following steps:  
1.  The surface must support at least 1.5 Kg for 
the Switch. 
2.  The power outlet should be within 1.82 
meters (6 feet) of the Switch. 
3.  Visually inspect the DC power jack and 
make sure that it is fully secured to the 
power adapter. 
4.  Make sure that there is proper heat 
dissipation from and adequate ventilation 
around the Switch.  Do not place heavy 
objects on the Switch. 
 
Connecting Network Cable 
The Switch supports 10Mbps Ethernet or 
100Mbps Fast Ethernet and it runs both in half 
and full duplex mode using two pair of Category 
5 cable.  
These RJ45 ports are Auto-MDI type port. The 
Switch can auto transform to MDI-II or MDI-X 
type, so you can just make an easy connection 
that without worrying if you are using a standard 
or crossover RJ45 cable. 
 
 
10