Promise Technology M310p User Manual

Page of 262
Chapter 5: Management with the CLU
135
1.
Highlight SMART and press the spacebar to toggle between Enable and 
Disable.
2.
Highlight SMART Poll Interval and press the backspace key to erase the 
current value.
3.
Type a new interval value in minutes.
1 to 1440 minutes (24 hours)
4.
Press Ctrl-A to save your settings.
Enclosure Management
Enclosure Management includes information, status, settings and location. To 
access Enclosure Management:
1.
From the Main Menu, highlight Subsystem Management and press Enter.
2.
Highlight Enclosure Management and press Enter.
To access FPU VPD information (vital product data on field replaceable units), 
highlight FPU VPD Information and press Enter.
To access the current status of the power supplies, blowers, temperature or 
voltage sensors, highlight the item you want and press Enter.
Enclosure Status
Enclosure Management 
The current status of the power supplies, blowers, temperature or voltage 
sensors:
1.
From the Main Menu, highlight Subsystem Management and press Enter.
2.
Highlight Enclosure Management and press Enter.
3.
Highlight power supplies, blowers, temperature or voltage sensors and press 
Enter.
Power Supply Units
This screen displays the operational and fan status of VTrak’s two power 
supplies.
PSU (power supply unit) status – Should show Power On and Functional
Fan Status – Should show Functional
Healthy Threshold – Minimum acceptable fan speed
Current Fan Speed – Should be greater than the Healthy Threshold value
If any status differs from those listed above or the fan speed is below the Healthy 
Threshold value, there is a fan/power supply malfunction. See “Chapter 6: 
Maintenance” on page 167.