Lucent Technologies R5SI User Manual

Page of 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-204
BRI-SET, ASAI-ADJ, BRI-DAT 
10
BRI Remote Loop Back Test (#627)
This test checks the integrity of a circuit switched B-channel connection between 
the switch and the endpoint.
In this test, the endpoint is put in the "maintenance busy" state to prevent the 
switch from issuing calls to the endpoint during the test. An application message 
containing a loop back activate request for the appropriate B-channel is sent to 
the endpoint. The endpoint responds with a loop back activated response. 
Maintenance then sends data to the endpoint over the B-channel under test. 
Since the B-channel is looped back at the endpoint, maintenance should receive 
the data that it sent. If no data is detected, the test fails. An application message 
containing a loop back deactivate request is then sent to the endpoint to 
terminate the remote loop back test. The endpoint responds with an MIM 
message containing a loop back deactivate response. Maintenance then 
releases the endpoint so that it is available to terminate calls.
1113
FAIL
The signaling link is not "bound" to the adjunct or 
endpoint. For BRI endpoints supporting MIM 
initialization, this error indicates that the endpoint has 
not been bound to a signaling link (that is, SPID 
initialization has not been completed). Since the 
signaling link associated with the endpoint is not 
identified until SPID initialization completes, this error 
does not imply that the signaling link is connected or 
disconnected at Layer 2 nor does it provide the status of 
TEI assignment for the endpoint. For ASAI adjuncts and 
BRI endpoints not supporting MIM initialization, this error 
indicates that the link is disconnected at Layer 2. Since 
the signaling link associated with the endpoint has been 
identified via administration, the link is only "unbound" 
from the endpoint when it is disconnected.
1. Execute the 
status bri-port PCSSpp
 command and 
refer to the associated procedures for this command 
contained in the BRI-PORT (ISDN-BRI Port) 
Maintenance documentation.
2. If the test continues to fail, escalate the problem.
Table 10-66.
TEST #626 Signaling Link Status Test  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page