Lucent Technologies R5SI User Manual

Page of 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-209
BRI-SET, ASAI-ADJ, BRI-DAT 
10
BRI XID Test (#628)
This test checks the D-channel connection between the SPE and the endpoint or 
adjunct.
In this test, a D-channel XID frame is sent to the endpoint or adjunct over the 
point-to-point signaling link. The test passes if the endpoint or adjunct responds 
with a Layer 2 XID-RESPONSE frame.
This test must be administered to not run in the station administration form for 
ports on a TN2208.
PASS
The endpoint has responded to the switch activate and 
deactivate loop back application messages. Data has 
been detected on the looped back channels.
1000
ABORT
Could not seize the endpoint or B-channels for test.
1. Retry the command at one-minute intervals a 
maximum of five times.
2. If the test continues to abort, escalate the problem.
Table 10-67.
TEST #627 BRI Remote Loop Back  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page