Lucent Technologies R5SI User Manual

Page of 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-291
CARR-POW (Carrier Port Power Unit) for DC-Powered Systems 
10
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
Battery & Battery Charger Query Test
, for example, you may also clear errors 
generated from other tests in the testing sequence.
a. Refer to POWER (Battery & Battery Charger) Maintenance documentation 
for a description of this test.
b. Refer to AC-POWER (AC Power) Maintenance documentation for a 
description of this test.
c. Refer to EMG-XFER (Emergency Transfer) Maintenance documentation 
for a description of this test.
d. Refer to CABINET (Cabinet Sensors) Maintenance documentation for a 
description of this test.
e. Refer to EXT-DEV (External Alarm) Maintenance documentation for a 
description of this test.
1.
D = Destructive; ND = Nondestructive
Order of Investigation
Short 
Test 
Sequence
Long 
Test 
Sequence
D/ND
1
Battery & Battery Charger Query Test (#5) 
(a)
X
X
ND
AC Power Query Test (#78) (b)
X
X
ND
Power Unit Query Test (carrier E) (#127)
X
X
ND
Power Unit Query Test (carrier D) (#127)
X
X
ND
Power Unit Query Test (carrier A) (#127)
X
X
ND
Power Unit Query Test (carrier B) (#127)
X
X
ND
Power Unit Query Test (carrier C) (#127)
X
X
ND
Emergency Transfer Query Test (#124) (c)
X
X
ND
Cabinet Temperature Query Test (#122) (d)
X
X
ND
External Alarm Lead Query Test (#120) (e)
X
X
ND
Analog Ring Generator Initialization Test 
(#117) (f)
X
X
ND
Analog Ring Generator Query Test (#118) 
(f)
X
X
ND