Lucent Technologies R5SI User Manual
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-449
DID-TRK (DID Trunk)
10
NPE Crosstalk Test (#6)
One or more NPEs reside on each circuit pack with a TDM Bus interface. The
NPE controls port connectivity and gain, and provides conferencing functions on
a per-port basis. The NPE Crosstalk Test verifies that this port’s NPE channel
talks on the selected time slot and never crosses over to time slots reserved for
other connections. If the NPE is not working correctly, one-way and noisy
connections may be observed. This test is usually only part of a port’s Long Test
Sequence and takes about 20 to 30 seconds to complete.
NPE controls port connectivity and gain, and provides conferencing functions on
a per-port basis. The NPE Crosstalk Test verifies that this port’s NPE channel
talks on the selected time slot and never crosses over to time slots reserved for
other connections. If the NPE is not working correctly, one-way and noisy
connections may be observed. This test is usually only part of a port’s Long Test
Sequence and takes about 20 to 30 seconds to complete.
1.
D = Destructive; ND = Nondestructive
Port Diagnostic Test (#35)
X
X
ND
Loop Around and Conference Circuit
Test (#33)
Test (#33)
X
ND
Port Audit Update Test (#36)
X
X
ND
Table 10-124.
TEST #6 NPE Crosstalk Test
Error
Code
Test
Result
Description/ Recommendation
ABORT
Could not allocate the necessary system resources to
run this test.
run this test.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the problem.
Continued on next page
Order of Investigation
Short Test
Sequence
Long Test
Sequence
D/ND
1