Lucent Technologies R5SI User Manual

Page of 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-570
DS1-BD (DS1 Interface Circuit Pack) 
10
Translation Update Test (#146)
The Translation Update Test sends the circuit-pack-level information specified by 
System Administration to the DS1 Interface circuit pack. Translation includes the 
following data administered for a DS1 Interface circuit pack (see output of 
display ds1 PCSS
 command): DS1 Link Length between two DS1 endpoints, 
Synchronization Source Control, All Zero Suppression, Framing Mode, Signaling 
Mode, Time Slot Number of 697-Hz Tone, Time Slot Number of 700-Hz Tone, etc.
If a TN767E or later DS1 circuit pack is combined with a 120A CSU Module to 
form and Integrated CSU Module, this test will also send the administration for 
this Integrated CSU to the circuit pack to assure the board’s translations are 
correct. The administration of the CSU Module is done using the DS1 circuit pack 
administration form. Translation for the CSU Module includes the following data: 
Transmit LBO, Receive ALBO, Supply CPE Loopback Jack Power?, and so forth.
Table 10-158.
TEST #146 Translation Update Test 
Error 
Code
Test Result
Description/ Recommendation
 
ABORT
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5 times.
 
FAIL
Internal system software error.
1. Enter the 
display ds1 PCSS
 command to verify the DS1 Interface circuit 
pack translation.
 
PASS
Translation data has been downloaded to the DS1 Interface circuit pack 
successfully.
0
NO BOARD
The test could not relate the internal ID to the port (no board). 
This could be due to incorrect translations, no board is inserted, an incorrect 
board is inserted, or an insane board is inserted.
1. Check to ensure that the board translations are correct. Use the 
add ds1 
PCSS
 command to administer the DS1 interface if it is not already 
administered.
2. If board was already administered correctly, check the error log to 
determine if the board is hyperactive. If this is the case, the board is shut 
down. Reseating the board will re-initialize the board.
3. If the board was found to be correctly inserted in step 1, issue the 
busyout board
 command.
4. Issue the 
reset board
 command.
5. Issue the 
release busy board
 command.
6. Issue the 
test board long
 command.
This should re-establish the link between the internal ID and the port.
Continued on next page