Lucent Technologies R5SI User Manual

Page of 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1122
POWER (Battery & Battery Charger) for AC-Powered Systems 
10
POWER (Battery & Battery Charger)
for AC-Powered Systems
Generic 1 and Generic 3iV2 offer two basic cabinet type configurations: (1) the 
multicarrier cabinet system and (2) the single-carrier cabinet system. Both 
cabinet system configuration may be powered by either an external AC or DC 
power source.
NOTE:
For environment maintenance, PPN or EPN cabinet configuration aspects 
for a High or Critical Reliability system are irrelevant.
The environment maintenance strategy to be used depends on both the cabinet 
configuration and the type of powering. Therefore, refer to the following list to find 
the appropriate section(s).
For a single-carrier cabinet system, refer to the DC-POWER 
(Single-Carrier Cabinet Power) Maintenance documentation for 
environment maintenance strategy.
For a multicarrier cabinet system using an external AC power source, refer 
to one or more of the following Maintenance documentation sections: 
AC-POWER (AC Power) for AC-Powered Systems, CARR-POW (Carrier 
Port Power Unit) for AC-Powered Systems, or POWER (Battery & Battery 
Charger) for AC-Powered Systems.
For a multicarrier cabinet system using an external DC power source, refer 
to one or more of the following Maintenance documentation sections: 
AC-POWER (AC Power) for DC-Powered Systems, CARR-POW (Carrier 
Port Power Unit) for DC-Powered Systems, or POWER (Battery & Battery 
Charger) for DC-Powered Systems.
The G3iV1.1-286 or G3iV2-386 multicarrier cabinet is equipped with 
rechargeable batteries that can span short AC power outages. In a multicarrier 
PPN system with High or Critical Reliability, the cabinet can be powered for 10 
seconds from the batteries. After this time, all port carrier power is shed and the 
control carrier is powered for another 10 minutes. In a High or Critical Reliability 
PPN system, these times are cut to five seconds and five minutes, respectively. 
In an EPN multicarrier cabinet, the entire cabinet can be powered for 15 seconds 
from the batteries, after which time the entire cabinet is powered down.
1.
Where P is an appropriate port network number determined via the PORT field from the 
Alarm or Error Log.
MO Name As 
It Appears in 
Alarm Log
Alarm 
Level
Initial System 
Technician 
Command to Run
1
Full Name of MO
POWER
MINOR
test environment P 
Battery & Battery Charger