Lucent Technologies R5SI User Manual
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-606
test journal-printer
8
Parameters
Help Messages
If the system technician presses
HELP
after entering "test journal-printer", the
following object command word choices will be displayed:
pms-log wakeup-log
Error Messages
If the link is not administered, the following error message will be displayed:
Link not administered or not enabled
If no tests can be found for the link, the following message will be displayed:
No tests for this MO
pms-log
This will test the link to the pms logging printer. The maintenance name
for the pms-log printer, displayed on the test results form on output, is
PMS-PRNT.
for the pms-log printer, displayed on the test results form on output, is
PMS-PRNT.
wakeup-log
This will test the link to the wakeup logging printer. The maintenance
name for the wakeup-log printer, displayed on the test results form on
output, is JNL-PRNT.
name for the wakeup-log printer, displayed on the test results form on
output, is JNL-PRNT.
short
This will cause the command to execute a series of nondestructive
diagnostic tests.
diagnostic tests.
long
This will execute a more comprehensive and longer version of the
diagnostic tests. This may involve both destructive and nondestructive
tests.
diagnostic tests. This may involve both destructive and nondestructive
tests.
repeat number
The "number" specifies how many times each test in the sequence is to
be repeated. "Number" may be any integer between 1 and 100.
be repeated. "Number" may be any integer between 1 and 100.
clear
This option causes the test sequence (short or long) to repeat until the
alarm (if one exists against the maintenance object) is cleared or a
single test in the sequence fails. If no alarms are registered against the
maintenance object then the test sequence will be exercised only
once. The long clear option forces a clear of all alarms if no errors are
encountered during testing. The short clear option only clears alarms
pertinent to tests in the short sequence.
alarm (if one exists against the maintenance object) is cleared or a
single test in the sequence fails. If no alarms are registered against the
maintenance object then the test sequence will be exercised only
once. The long clear option forces a clear of all alarms if no errors are
encountered during testing. The short clear option only clears alarms
pertinent to tests in the short sequence.
schedule
When the "schedule" option is specified, the command is validated and
then a scheduling form is displayed to allow the technician to schedule
execution of the command. The command is then placed in the
command queue and is executed at the specified time. The
information displayed by the command is sent to the system printer
instead of the screen. Refer to the Report Scheduler and System
Printer feature specification [1] for more details.
then a scheduling form is displayed to allow the technician to schedule
execution of the command. The command is then placed in the
command queue and is executed at the specified time. The
information displayed by the command is sent to the system printer
instead of the screen. Refer to the Report Scheduler and System
Printer feature specification [1] for more details.