AMCC 9590SE-4ME User Manual

Page of 93
Controller Object Commands
www.3ware.com 
47
/c
x
 add selftest=
ddd:hh
This command adds a new background selftest task to be executed on the day 
ddd (where ddd is Sun, Mon, Tue, Wed, Thu, Fri, and Sat), at hour hh 
(range 0 .. 23). Notice that selftest runs to completion and as such no duration 
is provided. A maximum of seven selftest tasks can be scheduled. This 
command will fail if no (empty) task slot is available. 
Example:
 //localhost> /c1 add selftest=Sun:16
adds a selftest background task schedule to be executed on Sundays at 16 
hours (4:00 PM).
Setting Up a Selftest Schedule
Setting up a selftest schedule requires several steps, and several different CLI 
commands in addition to /cx add selftest.
To set up the selftest schedule you want to use, follow this 
process:
1
Use the /cx show selftest command to display the current schedule for 
selftest tasks. (For details, see page 44.)
2
If any of the scheduled tasks do not match your desired schedule, use
the /cx del selftest command to remove them. (For details, see page 48.)
3
Use the /cx add selftest command to create the selftest schedule slots you 
want (described above.)
4
Use the /cx set selftest=enable command to enable the schedule (this 
enables all selftest schedule slots). (For details, see page 49.)
/c
x
 del rebuild=
slot_id
This command removes the rebuild background task in slot slot_id
Example
:
 //localhost> /c1 del rebuild=2
removes the rebuild background task in slot 2.
                                      
Warning:
 If all time slots are removed, be sure to also disable the schedule. 
Otherwise the applicable background task will never occur