Areca ARC-1130 User Manual

Page of 180
157
APPENDIX
• Humidity: 45-85%, non-condensing
Electrical
• Input Voltage
+3.6VDC
• On Board Battery Capacity
1000mAH (1*1000mAH)
Installation
1. Make sure all power to the system is disconnected.
2. Connector J1 is available for the optional battery backup 
module. Connect the BBM cable to the 12-pin battery connector 
on the controller.
3. Integrators may provide pre-drilled holes in their cabinet for 
securing the BBM using its three mounting positions. 
Battery Backup Capacity
Battery backup capacity is defined as the maximum duration 
of a power failure for which data in the cache memory can be 
maintained by the battery. The BBM’s backup capacity varied 
with the memory chips that installed on the SATA RAID control-
ler.