Ampro Corporation P/N 5001795A REV A User Manual

Page of 20
Chapter 1
ReadyPanel Setup
ReadyPanel
User’s Guide
3
Preparations
Setting Up the Work Space
1) Open shipping box.
Locate the ReadyPanel Contents List. See 
Figure 1-1
.
Unpack the contents of the shipping box. 
2) Verify contents.
Verify the contents of the shipping box against the Contents List included 
with your ReadyPanel shipping box. 
If anything is missing or damaged, call your sales representative. Refer to 
the Ampro web site at www.ampro.com for contact information.
3) Verify support 
documentation.
(ReadyBoard Support 
Software CD-ROM 
located in the first 
QuickStart Kit)
ReadyPanel User’s Guide
This document describes how to set up and power up the ReadyPanel and is 
provided on the ReadyBoard Support Software CD-ROM as a PDF file.
ReadyBoard Reference Manual
This document provides detailed reference information on the ReadyBoard 
and is located on the ReadyBoard Support Software CD-ROM as a PDF file.
ReadyBoard QuickStart Guide 
This document describes how to set up, install, and power up the ReadyBoard 
installed inside the ReadyPanel enclosure and is located on the ReadyBoard 
Support Software CD-ROM as a PDF file.
Operating System Manual(s)
These documents describe how to use the desired operating system (OS) with 
the ReadyPanel and provide more detailed programming and operating 
information. These documents may or may not be provided with ReadyPanel 
depending on the specific licensing requirements.
CAUTION
To prevent damage to the ReadyPanel, ensure sufficient clearance exists 
around the air vents for unrestricted airflow. 
The air temperature inside the enclosure could rise above the specified 
operating temperature limits if the airflow through the vents is restricted.
4) Select workbench 
location.
The workbench location should be a flat clean surface for setup and operation 
(including the connection of any external peripherals and optional devices). 
Ensure sufficient airflow clearance exists around the complete enclosure. 
Make sure to integrate mounting hardware or a method of tilting the Ready-
Board to one side to allow clearance for the cooling fan.
5) Unpack ReadyPanel.
Remove the ReadyPanel from its shipping container and place it on a flat work 
surface. 
The ReadyBoard and the ReadyPanel enclosure—with the desired OS pre-
installed—form a complete system ready for operation.