Symmetricom 1100 User Manual

Page of 224
Chapter 3 Installing the TimeProvider
Installation Check List
82
 TimeProvider User’s Guide
097-58001-02 Revision G – April 2008
Installation Check List
To verify that the installation of the TimeProvider is complete, perform the following 
checks and procedures in 
Powering Up the Shelf 
There is no power switch on the TimeProvider. When you apply power to the unit, it 
enters the warm-up state. See 
88, for more information on powering up the shelf.
Working With Cards
This section describes how to install, remove, and handle the cards associated with 
the TimeProvider.
Properly Handling Cards
When handling any of the cards, observe the following precautions:
Use proper static control precautions when handling cards! Protect the 
equipment against ESD (electrostatic discharge) by using a grounded protective 
wrist strap and normal equipment grounding.
Avoid touching component leads and edge connectors.
Avoid placing the card on an ungrounded surface.
Avoid allowing the card to come in contact with insulated surfaces.
Table 3-9.  Installation Completeness Checklist
Operation/Indication
Complete
Verify that all power and ground wires are installed correctly and securely.
Verify that all communications cables are properly installed.
Verify that all input and output cables are properly installed.