Paradyne 1900 User Manual

Page of 160
2. BitStorm 1900 Installation and Testing 
1900-A2-GN20-00
BitStorm 1900 Installation and Maintenance Guide
2-35
Installation Task List
The following is a complete list of all tasks to perform. To install the 
BitStorm 1900 complete each task in the order given.
Installing the BitStorm 1900
The following tasks and procedures have been provided to properly 
install the BitStorm 1900 components. The installation is organized 
into numbered tasks with each task containing all of the procedural 
steps for completion. Complete each task in the order given and 
complete each step for a task procedure in the order given before 
continuing on to the next task.
Task # and Description
Page