NEC NDA-30115-001 User Manual

Page of 116
Page 16
NDA-30115  Revision 1.0
Architecture
Property Management System - Communication Interface
Notes:
a: Preparation for reception complete.
b: Reception impossible.
c: Requests for preparation for reception (the PMS should not request this).
d: Transmitted up to 21 times.
e: Aborted at 22nd time.
f: Transmitted up to 7 times.
g: Aborted on the 8th time.
h: Message is received normally and preparation for next reception is complete.
i: Error found in message.
j: Interruption.
k: Information to be transmitted is present.
l: Information to be transmitted is absent.
m: Retransmission of message.
Table 2-8  Data Transmission Sequence (2 of 2)
Status
EOT
TTD
WACK
(Timeouts)
(Transmis-
sion Request)
Neutral (A)
ENQ -> (D)
Waiting for 
STX (B)
 -> (A)
d: NAK -> 
(B)
e: EOT -> 
(A)
EOT -> (A)
(25 sec)
Waiting for 
ETX, CRC 
(C)
 -> (A)
EOT -> (A)
(25 sec)
Waiting for 
ACK after 
start 
sequence 
(D)
 -> (A)
d: ENQ -> 
(D)
e: EOT -> 
(A)
d: ENQ -> 
(D)
e: EOT -> 
(A)
f: ENQ -> 
(D)
g: EOT -> 
(A)
Waiting for 
ACK after 
message (E)
 -> (A)
d: ENQ -> 
(D)
e: EOT -> 
(A)
d: ENQ -> 
(D)
e: EOT -> 
(A)
f: ENQ -> 
(D)
g: EOT -> 
(A)
(3 sec)