Nortel Networks NN44200-300 User Manual

Page of 64
33
Chapter 4
Power supply installation
In this chapter
Safety precautions
Equipment handling guidelines
External power equipment, such as an uninterruptible power supply (UPS),
is usually very heavy. This equipment requires special handling procedures
and additional personnel for unloading and installation. Be aware of weight
distribution, and prevent the equipment room floor from being overly
stressed.
Safety information
In DC systems, locate the service panel near the entry to the room
containing the DC power system that supplies the server.
DANGER
Procedures involving electrical connections must be performed
only by qualified personnel.
Ensure that you obey all displayed warning notices on power
equipment and connections.
Nortel CallPilot
1002rp Server Hardware Installation
NN44200-300
01.01
Standard
5.0
23 February 2007
Copyright © 2007, Nortel Networks
Nortel Networks Confidential
.