Nortel Networks 1002rp User Manual

Page of 86
October 2006
Preparing for installation
1002rp Server Hardware Installation
37
Unpacking the 1002rp server
Introduction
Follow this procedure to unpack the server and peripherals.
To unpack the equipment
Carefully open the cardboard carton containing the server.
Remove the server from the carton; set it on the floor.
Carefully open the cartons containing the monitor, keyboard, mouse, 
modem, and ELAN hub (if supplied), and set the peripherals aside.
Put all manuals, CD-ROMs, operating system disks, and any disks for 
peripherals in a safe place.
WARNING
Risk of personal injury
The 1002rp CallPilot server weighs approximately 34 kg 
(75 lb) as shipped from manufacturing. To prevent personal 
injury, have someone help you to unpack and position the 
server.
ATTENTION
As you unpack each item, check it off against the 
packing list, as well as against the following 
checklists provided in the Installation and 
Configuration Task List
 (555-7101-210):
„
“CallPilot software media and documentation 
checklist”
„
“CallPilot server hardware checklist”