Nortel Networks 201i User Manual
Preparing for installation
Standard 1.07
36
CallPilot
Installation overview
Introduction
This section provides a high-level overview of the requirements and
procedure for installing the 201i server.
procedure for installing the 201i server.
For a list of CallPilot documentation, see the document map on page 7.
Before you begin
Ensure that proper power and grounding are available for all the power
outlets serving the CallPilot server and its associated peripherals. Power for
these devices must be wired and fused independently of all other receptacles
and referenced to the same ground as the PBX system.
outlets serving the CallPilot server and its associated peripherals. Power for
these devices must be wired and fused independently of all other receptacles
and referenced to the same ground as the PBX system.
A qualified electrician must implement the single-point ground reference as
required between the power outlets of the CallPilot server and the power
outlets of the switch.
required between the power outlets of the CallPilot server and the power
outlets of the switch.
Provide a sufficient number of properly grounded power outlets or power
bars for all equipment.
bars for all equipment.
For more information, refer to Chapter 2, “Grounding and power
requirements”, in the CallPilot Planning and Engineering Guide.
requirements”, in the CallPilot Planning and Engineering Guide.