This section provides a high-level overview of the requirements and 
procedure for installing the 201i server.
For a list of CallPilot documentation, see the document map on page 7.
Before you begin
Ensure that proper power and grounding are available for all the power 
outlets serving the CallPilot server and its associated peripherals. Power for 
these devices must be wired and fused independently of all other receptacles 
and referenced to the same ground as the PBX system. 
A qualified electrician must implement the single-point ground reference as 
required between the power outlets of the CallPilot server and the power 
outlets of the switch. 
Provide a sufficient number of properly grounded power outlets or power 
bars for all equipment.
For more information, refer to Chapter 2, “Grounding and power 