Spares planning
Definitions and assumptions
Failure rate: Spares planning is based on the Failure rate of the replaceable 
part. The failure rate is defined as the estimated number of failures for that 
item during one million (10
6
) hours of operation. 
Sparing interval: the sparing interval is the period of time that the stock of 
items should last without being replenished. This period is assumed to be one 
year after the installation of the system.
Stock confidence level: the stock confidence level is the allowed probability 
of not going out of stock during the sparing interval. This is assumed to be 
greater than 99.9 percent.
Turnaround time for repair: the turnaround time for repair is the length of 
time it takes to repair a failed spares item.
The turnaround time from a repair house is estimated to be 10 working days 
(240 hours). (See Figure 17).
Figure 17
Single depot or repair house service
The turnaround time from a centralized depot is estimated to be 2 working 
days (48 hours). (See Figure 18.)