Sun Microsystems 2.0 User Manual

Page of 64
Chapter 2
Hardware Installation and Removal
15
4. Verify that the selected NEM has returned the expected feedback.
See
.
Using the ILOM Command-Line Interface
1. Log in to the ILOM CLI of the active Chassis Monitoring Module.
2. For a list of components in your system, type:
show /CH
3. If you installed a new NEM, go to Step 4.
When you were preparing a NEM for a hot-remove, if you corrected the problem
without removing the NEM or you decided not to remove the NEM, complete the
following step:
Type this command to prepare a component for a hot-insert:
set /CH/
component return_to_service_action=true
For example:
set /CH/NEM1 return_to_service_action=true
4. To verify that the NEM Ready to Remove status has changed to Not Ready, type:
show /CH/
component prepare_to_remove_status
The system returns:
prepare_to_remove_status = Not Ready
5. Verify that the selected NEM has returned the expected feedback.
See the
.
Verifying a Hot-Insert Operation
You can replace many components in the chassis while the system is running by
using a hot-plug procedure.
To insert modules into the chassis while the system is running, you need to:
1. Physically install the module.
2. Verify in one of the ILOM interfaces that the module’s Ready to Remove status is
Not Ready and that the module has returned the expected feedback.
See
.