Promise Technology TX2200 User Manual

Page of 128
FastTrak TX2200, TX2300 User Manual
82
You can monitor Migration progress on the Logical Drive Migration tab. Click the 
respective buttons to pause, resume or abort the Synchronization or Redundancy 
Check.
Scheduled
To schedule a Synchronization or Redundancy Check:
1.
Click on the Logical Drive View 
 icon in Tree View.
2.
Click on the Logical Drive 
 icon of the logical drive you want to 
synchronize.
3.
Click on the Synchronization tab in Management View.
4.
In the Policy dropdown menu, select Fix if you want Synchronization or 
Redundancy Check if you do not want to correct inconsistencies.
5.
Click on the Enable option.
6.
Click on the by Dayby Week or by Month option.
7.
From the dropdown menus, select a start time and a day of the Week or 
Month, if applicable.
Start time is based on a 24-hour clock.
8.
Click the Schedule button.
Cancel a Schedule
If you want to cancel the scheduled Synchronization or Redundancy Check, do 
the following:
1.
Click on the Logical Drive View 
 icon in Tree View.
2.
Click on the Logical Drive 
 icon.