Zhone Technologies Z-PLEX-10-24-DOC-SC User Manual

Page of 101
2-4 \ 
Zhone Technologies
Model No.
Running Head
Installing the product
Installing the Z-Plex
1. Never install telephone wiring during a lightning storm.
2. Never install this product in a wet location.
3. Never install telephone jacks in wet locations unless the jack is specifically designed for 
this purpose only.
4. Never touch uninsulated telephone wires or terminals unless the telephone line has first 
been disconnected at the network interface.
5. Use caution when installing or modifying telephone lines.
6. Never attempt to service this product unless you are an authorized service technician. 
Doing so can result in injury or damage to the unit and void all warranties.
7. This product is intended for use with a three-wire grounding type plug. This is a safety 
feature. Equipment grounding is vital to ensure safe operation. Do not defeat the purpose 
of the grounding type plug by modifying the plug or using an adapter.
8. Prior to installation use an outlet tester or a voltmeter to check the AC receptacle for the 
presence of earth ground. If the receptacle is not properly grounded, the installation must 
not continue until a qualified electrician has corrected the problem. In addition, a 
connection for earth or safety grounding is provided on the chassis. It is a #6 threaded stud 
located next to the AC inlet receptacle.
9. Slots and openings in the product are provided for ventilation. To ensure reliable operation 
of the product and to protect it from overheating, these slots and openings must not be 
blocked or covered.
10. DO NOT allow anything to rest on the power cord and do not locate the product where 
persons could step or walk on the power cord.
11. DO NOT attempt to service this product yourself. To avoid exposure to dangerous high 
voltage points or other risks, refer all servicing to qualified service personnel. 
12. Special cables, which may be required by the regulatory inspection authority for the 
installation site, are the responsibility of the buyer.
13. When installed in the final configuration, the product must comply with the applicable 
Safety Standards and regulatory requirements of the country in which it is installed. If 
necessary, consult with the appropriate regulatory agencies and inspection authorities to 
ensure compliance.
14. A rare phenomenon can create a voltage potential between the earth grounds of two or 
more buildings. If products installed in separate buildings are interconnected, the voltage 
potential may cause a hazardous condition. Consult a qualified electrical consultant to 
determine whether or not this phenomenon exists and, if necessary, implement corrective 
action prior to interconnecting the product.