ZyXEL Communications Prestige 642 User Manual

Page of 92
Prestige 642 PPPoE Modem
Hardware Installation & Initial Setup
2-1
Chapter 2
Hardware Installation & Initial Setup
This chapter describes the physical features of the Prestige
 and how to make the cable connections
.
2.1  Front Panel LEDs of  the P642
The LED indicators on the front panel indicate the operational status of the Prestige. The table below the
figure describes the LED functions:
Figure 2-1 Front Panel of the P642
Table 2-1 Front Panel LED Description
LED
COLOR
STATUS
MEANING
PWR
Green
On
Power is applied to the Prestige.
SYS
Green
On
Off
Blinking
The Prestige is on and functioning properly.
The system is not ready or has malfunctioned.
The system is rebooting.
LAN 10M
Green
On
Blinking
The Prestige has a successful 10Mb Ethernet connection.
Data is being sent/received.
LAN 100M
Green
On
Blinking
The Prestige has a successful 100Mb Ethernet connection.
Data is being sent/received.
ADSL
Green
On
Off
Blinking
The Prestige is connected successfully to a DSLAM.
The link is down.
Data is being sent/received.