Adtran MX2800 M13 User Manual

Page of 200
A-12    
61200290L1-1G
Appendix A, Acceptance Test Procedure
MX2800 M13 Multiplexer User Manual
9. SIGNING-OFF THE MX2800 ATP CHECKLIST
Use 
 to identify the MX2800 configuration, identify tests performed, etc. 
Table A-1.  MX2800 ATP Checklist
Acceptance Test Procedure Steps
Completed
Verifying the Installed Options
Dual Power Supplies / Dual Power Feeds
Dual Power Supplies / Single Power Feed
Single Power Supply / Dual Power Feeds
Single Power Supply / Single Power Feed
Dual Controllers
Single Controller
Configuring the System
Accessing the Craft Port
Provisioning the DS3 Port
Provisioning the DS1 Ports
Alarm Relay Configuration
Verifying the Data Integrity
DS1 Daisy-Chain to DS3 (Hard) Loopback
DS1 to DS3 “Head-to-Head” Test
DS1 to DS3 (Hard) Loopback
Verifying Alarm Notification
Critical Alarm Relay Test
Noncritical Alarm Relay Test
Verifying System Redundancy
Redundancy Tests (Power Supply and Power Feed as appropriate)
Controller Card Redundancy Test
Autonomous Alarm Reporting
Restoring Default Settings
Configuring the System for Traffic Readiness
NAME: DATE:
LOCATION: RELAY 
RACK: