Raritan Computer CCA-0N-V5.1-E User Manual

Page of 420
Chapter 15: Advanced Administration 
 
280
 
 
 
Schedule a Task 
This section covers most tasks that can be scheduled. See 
Schedule a 
Device Firmware Upgrade
 (on page 282) for details on scheduling 
device firmware upgrades. 
 
To schedule a task: 
1.  Choose Administration > Tasks.   
2.  Click New. 
3.  In the Main tab, type a name and description for the task. Names can 
have 1-32 alphanumeric characters or underscores, no spaces. 
4.  Click the Task Data tab. 
5.  Click the Task Operation drop-down menu and select the task you 
want to schedule. Note that the fields requiring data will vary 
according to the task selected. See the following sections for details 
on each task. 
  Active Directory Synchronization: See 
Synchronize All AD 
Modules
 (on page 199) 
  Backup CommandCenter: See 
Backing Up CC-SG
 (on page 
222) 
  Backup Device Configuration: See 
Backing Up a Device 
Configuration
 (on page 83) 
  Pause/Resume Device Management: See 
Pausing CC-SG's 
Management of a Device
 (on page 88) and 
Resuming 
Management
 (see "
" on 
page 89) for pausing and resuming individual devices. See 
Pause and Resume Management of Devices Using a 
Scheduled Task
 (on page 89) for details on scheduling a task to 
pause and resume multiple devices or device groups. 
  Copy Device Configuration: See 
Copying Device 
Configuration
 (on page 87) 
  Group Power Control: See Node Group Power Control 
  Outlet Power Control: See the CC-SG User Guide. 
  Power IQ Synchronization: See 
Synchronize Power IQ and 
CC-SG
 (on page 341)
  Purge Logs: See 
Configuring Logging Activity
 (on page 248)
  Restart Devices: See 
Restarting a Device
 (on page 88) 
  Restore Device Configuration: See 
Restoring Device 
Configurations
 (on page 84) (does not apply to device groups)