Schneider Electric E4800 User Manual

Page of 48
PowerLogic
TM 
EM4800 Series
 930-110-01-B.00
Installation 
04/2011
© 201
 Schneider Electric All Rights Reserved
8
If using a modem, these items are also required:
phone or butt set to test the phone line
RJ11 junction box 
RJ11 splitter to tap into the existing junction box
RJ11 patch cable
xDSL filter if required (many businesses have their internet access on 
the same line as the fax)
Site Planning
1.
Determine the number of PowerLogic EM4800 series meters to be 
installed and ensure adequate space. For clearances, see Figure 4 on 
page 10
.
2.
Determine the number of analog phone lines or Ethernet drops 
required, and ensure they are installed before installing the PowerLogic 
EM4833, EM4880 and EM4805 meters. The recommended maximum 
number of PowerLogic meters per phone line is 50.
3.
Determine the number and types of meters or monitors required 
(single-phase, network, or three-phase).
4.
Determine the model number and correct sense voltage based on the 
voltage label on the top right side of the unit.
Access to Power and Lighting
The installation site must be supplied with access to the main electrical panel 
and any sub-panels. Portable or permanent lighting must be available to 
provide the installers with a clear view of the equipment and of the installation 
environment. Each installation may vary depending on physical site 
restrictions.
Installation Procedures
This section provides information about activities that must be performed to 
install the PowerLogic EM4833, EM4880 and EM4805 meters in a 
single-phase 2-wire, single-phase 3-wire (network), or three-phase 4-wire 
application. The installation procedures must be performed in the following 
order:
1.
2.
3.
4.
5.
a.
b.
c.
6.
7.