Emulex NQGB-NT+ User Manual

Page of 207
Printer Server Installation   2-17 
  
NOTE:  Serial cable between the printer server and the 
peripheral device or console terminal should not 
exceed 50 feet (15.24 meters).  Connection can be 
made through a null modem cable. 
Power Up 
1)  Verify the LAN connection to the printer server is secure. 
2)  Verify all serial and parallel cable connections are secure. 
3)  Attach power cable to the printer server AC power receptacle and to an 
accessible AC power outlet.  The printer server will power up. 
CAUTION:  The AC power outlet must be accessible for 
immediate removal of power. 
MAC ADDRESS
00-00-C9-01-A0-6A
POWER
Power
 
Figure 2-12:  Power Outlet 
NOTE:  If the printer server is being used outside the 
United States where voltages may vary, it will 
automatically adapt to the change of input voltages 
when AC power is applied.  Please refer to the 
power cord selection card supplied with the printer 
server for appropriate power cord configuration.