IBM 4QX User Manual

Page of 208
 
 NetBAY Power Distribution Units
 173
Figure 83. Installing the Rack PDUs and the blank filler panel
6.
Install the 1U blank filler panel 
c1d on the front of the rack cabinet at the same U 
level as the Rack PDU.  Use two M6 screws that come with this option.
Cabling your PDUs
Cable routing differs between horizontal and vertical Rack PDU installations.  Refer to 
“Cabling instructions for vertical-mount PDUs” on page 175 or “Cabling instructions 
for horizontal-mount PDUs” on page 176 as appr
opriate for your installation.