GE 225 User Manual

Page of 38
 
GE
 
OPM_SGS_ISG_M22_M30_0US_V011.doc 
32/38
 Installation 
Guide 
SG Series 225 & 300 kVA 
 
3.11  CONTROL BUS CABLE LOCATION 
 
 
 
Warning! 
This installation must be verified by trained personnel before the initial start-up 
(ensure that the UPS installation is completely powered down). 
 
S
G
S
_2
25-
300
_R
P
A
 con
tr
ol b
us
 c
able_01
Q1
Q2
A
2
4
3
1
3
4
2
1
Fig. 3.11-1   View electronic module on intermediate unit
 
Access to the control bus 
connection. 
 
The control bus connection 
between parallel units must be 
made on the front of the 
electronic module fitted 
behind the front doors. 
 
To properly route the control 
bus cables the safety screen 
A” must be removed. 
 
SG
T5
000_
100-15
0_RPA cont
rol
 bu
s c
able
_
02
US
Next parallel unit
JB2
JB1
JA2
JA1
A
A
JA
JB
 
Fig. 3.11-2   Front view electronic module on intermediate unit
 
Control bus cables connection. 
 
• 
Plug the cables JA  (1/2/3/4/5/6/7) 
and  JB  (1/2/3/4/5/6/7) onto the RJ 
connectors  JA and JB  located on 
parallel bus PCB P34 – Bus 
Interface IM0048
  
(going to “P13 – 
RPA Board IM0006”
  J52(A) and 
J62(B)). 
 
• 
Fix both cables JA  (1/2/3/4/5/6/7) 
and JB (1/2/3/4/5/6/7) to parallel bus 
socket connecting the cable shield to 
ground by means the cable clamps 
A“.