DELL J728N User Manual

Page of 71
29
 
Installation
|
UPS Initial Startup
To start up the UPS:
1
Verify that the internal batteries are connected.
2
If an optional EBM is installed, verify that the EBM is connected to the UPS.
3
Verify that the power input to the UPS has adequate upstream overcurrent protection:
Table 1. Minimum Upstream Circuit Breaker Rating
UPS Output Power
120V
208V
230V
2700W
30A
20A
16A
Table 2. Power Cord Ratings  
Dell UPS Model and Voltage
Power Cord
Rating
Country
Supplied Cord Set
2700W
208V
L6-20P to C19
15A
North America
Yes
C19 to C20 Jumper
16A
North America
Optional
2700W
230V
CEE 7/7 Schuko to C19
16A
Europe (Schuko)
Yes
BS 1363 to C19
13A
United Kingdom (New)
Yes
GB2009.1 to C19
16A
China
Yes
C19 to C20 Jumper
16A
Europe/Australia
Yes
C19 to C20 Jumper
16A
China
Yes
BS 546 to C19
15A
United Kingdom(Old)
Optional
TI16S3 to C19
16A
Thailand
Optional
AS 3112 to C19
15A
Australia
Optional
IRAM2073 to C19
16A
Argentina
Optional
CEI 23-50 to C19
16A
Italy
Optional
KSC8305 to C19
15A
South Korea
Optional
IS 1293 to C19
16A
India
Optional
NBR 14136 to C19
16A
Brazil
Optional
C19 to C20 Jumper
16A
North America
Optional
L6-20P to C19
15A
North America
Optional