Trial  Run
Inspections  before  Trial  Run
1) Inspecting the wiring
• Make sure that all wire connections (especially main power and motor output ) are correct.
• Make sure that there is no short, and earth wires are properly connected.
• Make sure that there is no poor connections.
2) Inspecting the
    power specifications
• Make sure that the voltage is
  correct.
3) Securing the servo motor
•  Make sure that the servo
   motor is firmly secured.
4) Disconnecting the motor load
     Trial run without load
5) Releasing the brake