Powerware UPS20-30kVA User Manual

Page of 52
12
UPS 20-30 kVA, 230 V 0/60 Hz output  
User’s Guide
1026743 
Revision B
4.  Planning before installation
The equipment must be installed in upright position. The equipment requires space to front and 
back to enable cooling airflow. Service and maintenance require 00 mm clearance on right 
hand side. All cooling air enters at front and exits at unit rear. The required min. clearance from 
unit rear to an obstruction is 20 mm. Because the service and user access is in the front there 
should be reserved enough space (min 600 mm).
It is required to arrange ventilation of the UPS room. Sufficient amount of air cooling is needed 
to keep the max. room temperature rise at desired level:
Temperature rise of max. +°C requires the airflow of 600 m
3
 per 1 kW of losses.
Temperature rise of max. +10°C requires the airflow of 300 m
3
 per 1 kW of losses.
An ambient temperature of 1 to 2 Celsius degrees is recommended to achieve a long life of 
the UPS and batteries. The cooling air entering the UPS must not exceed +40 °C. Avoid high 
ambient temperature, moisture and humidity.
The floor material should be non-flammable and strong enough to support the heavy load. The 
UPS has (4) leveling feet that should be used when finalising the installation. The diameter of a 
single leveling foot is 29 mm.  
Equipment
Weight
Point
Distributed
Note
20-30 kVA
20-30 kVA
20-30 kVA
UPS w/o BAT 
200 kg 
7.57 kg/cm
2
531 kg/m
2
No Batteries installed
UPS+1 BAT
300 kg
11.35 kg/cm
2
797 kg/m
2
1 Battery string installed
UPS+2 BAT
400 kg
15.14 kg/m
2
1063 kg/m
2
2 Battery strings installed
UPS+3 BAT
500 kg 
18.92 kg/cm
2
1328 kg/m
2
3 Battery strings installed
UPS+4 BAT
600 kg
22.71 kg/cm
2
1594 kg/m
2
4 Battery strings installed
EXT BAT 0
150 kg
5.67 kg/cm
2
401 kg/m
2
No Batteries installed
EXT BAT 1
510 kg
19.29 kg/cm
2
1362 kg/m
2
1 Battery string installed
EXT BAT 2
870 kg
32.90 kg/cm
2
2323 kg/m
2
2 Battery strings installed
Table 1 The floor surface must tolerate loading.