Powerware 380/220V User Manual

Page of 72
EATON Powerware
®
 Energy Management System (EMS) Upgrade Kit User’s Guide  
S
  164201724 Rev 1
 www.powerware.com
7
Chapter 2
Installation
This section explains:
S
Equipment inspection
S
Unpacking
S
Parts list
S
Required tools
S
Installation and wiring
S
Initial configuration
S
Advanced Metering installation
Inspecting the Equipment
If any equipment has been damaged during shipment, keep the shipping
cartons and packing materials for the carrier or place of purchase and file
a claim for shipping damage. If you discover damage after acceptance,
file a claim for concealed damage.
To file a claim for shipping damage or concealed damage:  1) File with
the carrier within 15 days of receipt of the equipment; 2) Send a copy of
the damage claim within 15 days to your service representative.
Unpacking the Cabinet
Use care when moving and opening the carton. Leave the components
packaged until ready to install.
To unpack the cabinet:
1.
Open the outer carton and remove the items packaged with the
cabinet.
2.
Carefully lift the cabinet out of the outer carton.
3.
Discard or recycle the packaging in a responsible manner, or store it
for future use.
Place the cabinet in a protected area that has adequate airflow and is
free of humidity, flammable gas, and corrosion.