Toshiba 4200FA CT/XT User Manual

Page of 68
TOSHIBA 
 
4.3 
Power Connections 50 kVA  
 
The following illustrates the wiring connections from the power distribution panel (not 
 
part of the UPS) to the terminal block of the 50 kVA UPS Model 
 
 
       (H1)  (H2)   (H3)   (N)    (L1)   (L2)    (L3)    (N)     (+)     (-) 
OUTPUT: 3-phase (4-wire) 
INPUT: 3-phase, 3-wire 
208 V requires 3-phase,  
4-wire 
 
TB1 
 
 
 
Optional: Bypass Input: 
3-phase, 3-wire 
208 V requires 3-phase, 
4-wire 
(H1)     (H2)     (H3)     (N) 
 
 
 
 
 
TB4 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4200FA CT/XT User’s Manual 
 
 
25