Toshiba 480 V User Manual
![Toshiba](https://files.manualsbrain.com/attachments/acaaaa9cc6b763ccfc72ced2ae95d9c94b8b8632/common/fit/150/50/8adbcbcd45c75dc53932fc9caf6f2740daed52d836b76efbd0162ac2599f/brand_logo.png)
105
G8000 Series Installation and Operation Manual
Appendix C - 500kVA Input- and Output- Cabinet Joining
Instructions
Joining the G8000 500kVA Sections
1. Remove Shipping Material (Retain Connection Kit Box and Manual).
2. On a leveled floor bring the two cabinets together. Input cabinet on the left side. See
1. Remove Shipping Material (Retain Connection Kit Box and Manual).
2. On a leveled floor bring the two cabinets together. Input cabinet on the left side. See
FIG. 1. Leave a gap of 0.25”-0.30” between the cabinets. See FIG. 2.
3.
4. On Input cabinet: Open the door, remove back panel (retain hardware). See FIG. 3.
Insert 1/2-13X1.75” bolt, flat & lock washer assembly (supplied); two in the front and
two in the back. See FIG. 4 & FIG. 5.
INPUT CABINET
OUTPUT CABINET
LEAVE A GAP OF 0.25”-0.30”
BETWEEN CABINETS
FIG. 1
FIG. 2