3com Webcache 1000 (3C16115) User Manual

Page of 176
The Power-up Sequence
31
Slide the rack-mounting brackets on the sides of the Webcache into the 
rack-mounting rails.
Secure the front of the Webcache to the rack with the captive 
thumbscrews, as shown in Figure 8.
Figure 8   Attaching the Webcache to the Rack
Ensure that the ventilation holes in the Webcache are not obstructed.
The Power-up 
Sequence
The following sections describe how to get your Webcache powered-up 
and ready for operation.
Powering-up the
Webcache
Use the following sequence of steps to power-up the Webcache:
Plug the power cord into the power socket at the rear of the Webcache.
Plug the other end of the power cord into your power outlet.
The Webcache automatically powers-up, which takes approximately 
60-90 seconds. During power-up all of the LEDs light and the Power/Self 
test LED flashes green. When the Webcache has powered-up and is 
operating normally, the Power/Self test LED changes to non-flashing 
green.