3com 4210 PWR 18-PORT User Manual

Page of 74
Mounting the Switch on a Desktop
27
Figure 22   Installation completed 2
Mounting the Switch 
on a Desktop
In many cases, standard 19-inch racks are not available. Therefore, switches are 
often placed on a desktop. To place your switch on a desktop, you simply need to:
Make sure that the surface is clean, flat, and sturdy.
Makes sure that the environment is well ventilated and allow 10 cm (3.9 in.) of 
space around the chassis for heat dissipation. 
Do not place heavy objects on your switch.
When stacking, the vertical distance between two switches must be at least 1.5 
cm (0.59 in). 
The Power-up 
Sequence
The following sections describe how to get your Switch 4210 powered-up and 
ready for operation.
Powering-up the Switch
4210
Use the following sequence of steps to power-up the Switch.
1
Plug the power cord into the power socket at the rear of the Switch.
2
Plug the other end of the power cord into your power outlet.
The Switch powers-up and runs through its Power On Self Test (POST), which 
takes approximately one minute.
Checking for Correct
Operation of LEDs
During the Power On Self Test, all ports on the Switch are disabled and the LEDs 
light. The PWR LED will flash green during the POST.
When the POST has completed, check the PWR LED to make sure that your Switch 
is operating correctly. Table 13 shows possible colors for the LED.
Screw 1: Fix the rear bracket to the mount 
angle.
Screw 2 is mounted to the switch. 
Screw 2
Screw 1
Rear mount  angle
Rear bracket
Screw 2
Screw 1
Rear mount  angle
Rear bracket