Enterasys Networks 6H303-48 User Manual

Page of 90
Unpacking the DFE-Gold Module
3-2 Installation
Unpacking the DFE-Gold Module
Unpack the DFE‐Gold module as follows:
1.
Open the box and remove the packing material protecting the DFE‐Gold module.
2.
Verify the contents of the carton as listed in 
.
3.
Remove the tape seal on the non‐conductive bag to remove the DFE module.
4.
Perform a visual inspection of the DFE‐Gold module for any signs of physical 
damage. Contact Enterasys Networks if there are any signs of damage. Refer to 
Installing Optional Network Expansion Modules
Installing a network expansion module involves 
removing the coverplate from the DFE‐Gold module,
attaching the network expansion module to the DFE‐Gold module, and 
if required, installing the Mini‐GBICs.
For information about...
Refer to page...
Table 3-1 Contents of DFE-Gold Module Carton
Item
Quantity
DFE-Gold module (4G4202-72
 or 
4G4282-49) 1
This Installation Guide
1
Customer Release Notes
1
Note: Install any optional equipment before proceeding to “
on page 3-9 for an explanation of the rules to install different series modules in a Matrix E7 
chassis.
Caution: An antistatic wrist strap is required to perform the following procedures to 
minimize ESD damage to the devices involved.
Precaución: Para minimizar los efectos de las descargas de electricidad estática, deberá 
utilizar una pulsera antiestática al realizar los siguiente procedimientos.