Extreme networks 12802 User Manual

Page of 160
Extreme Networks 325 W AC Power Supply
 
BlackDiamond 12800 Series Switches Hardware Installation Guide
95
Do not put your hand into an open power supply bay when a power supply is not present. Empty power supply bays 
require a cover plate at all times.
You need the following tools and equipment to install or remove an Extreme Networks 325 W AC PSU:
ESD-preventive wrist strap
Power supply cord (110 V AC, 220 V AC, or applicable to country of use)
#2 Phillips screwdriver
Thermal protective gloves (required for removal)
NOTE
A minimum of two Extreme Networks 325 W AC PSU are required to run a BlackDiamond 12802 switch.
Installing an Extreme Networks 325 W AC PSU
CAUTION
Make sure that the Extreme Networks 325 W AC PSU circuit is not overloaded. Use proper over-current protection, 
such as a circuit-breaker, to prevent over-current conditions.
To install an Extreme Networks 325 W AC PSU:
1
Attach an ESD-preventive wrist strap to your wrist and connect the metal end to the ground 
receptacle on the top-right corner of the switch front panel.
2
Make sure that the Extreme Networks 325 W AC PSU is right side up (see 
Figure 56: Extreme Networks 325 W AC PSU
3
Carefully slide the Extreme Networks 325 W AC PSU all the way into an open power supply bay 
(see 
) until you hear a click. 
Extreme Networks recommends that you populate the two left power supply bays before the two 
right power supply bays. Refer to 
 for the recommended installation sequence.
Torino AC PSU_04
325W AC PSU