Atlantis Land 1000BASE-T User Manual

Page of 23
 
6
 
Installation 
The site where you place the Switch may greatly affect its 
performance. When installing, take the following into your 
consideration: 
 
Install the Switch in a site free from strong electromagnetic field 
generators (such as motors), vibration, dust, and direct exposure 
to sunlight. 
 
Leave at least 10cm of space at the front and rear of the Switch for 
ventilation. 
 
Install the Switch on a sturdy, level surface that can support its 
weight, or in an EIA standard-size equipment rack.   
 
For information on rack installation, see the next section Rack 
Mounting. 
 
When installing the Switch on a level surface, attach the adhesive 
rubber pads to the bottom.  The rubber pads cushion the Switch 
and protect its case from scratching.