LevelOne GSW-1674T User Manual

Page of 41
 
7
UNPACKING AND INSTALLATION 
This chapter provides unpacking and installation information for 
LevelOne GSW-1674T/2474T. 
Unpacking 
Open the shipping cartons of the Switch and carefully unpacks its 
contents.  The carton should contain the following items: 
‹
 
One 24-Port 10/100/1000Mbps Gigabit Ethernet Web Smart 
Switch 
‹
 
One AC power cord, suitable for your area’s electrical power 
connections 
‹
 
Four rubber feet to be used for shock cushioning 
‹
 
Screws and two mounting brackets 
‹
 
CD-Rom with Web Management Utility and User’s Guide 
If any item is found missing or damaged, please contact your local 
reseller for replacement. 
Installation 
The site where you install the hub stack may greatly affect its 
performance. When installing, consider the following pointers: 
Install the LevelOne GSW-1674T/2474T in a fairly cool and dry 
place.  See Technical Specifications for the acceptable temperature 
and humidity operating ranges. 
Install the Switch in a site free from strong electromagnetic field 
generators (such as motors), vibration, dust, and direct exposure to 
sunlight.