Meridian America 61 User Manual

Page of 867
About this document
This section of the Planning and engineering guide deals with planning the
environment that the SL-1 (Option 
 and 71) system will inhabit,
including equipment location, commercial power requirements (AC and
DC), grounding, and cabling requirements. Most of the considerations for
site planning and installation are common for both AC- and DC-powered
systems. Where there are differences, these are noted in the applicable
sections. The information is intended to assist with the site selection, site
planning, and installation planning process.
References
See the SL-1 planning   engineering guide 
for
 Muster index 
 System overview (553-3001-100)
 Installation planning 
(553-3001-120)
 System engineering 
(553-3001-151)
 Power engineering 
(553-3001-152)
 
 
(553-3001-153)
Equipment identification and ordering 
(553-3001-154)
See the list of line and trunk circuit descriptions in the 
Muster index
 for specific references to lines and trunks.
See the SL-1 installation and maintenance guide 
for
System installation procedures 
(553-3001-210)
Circuit pack installation and testing 
(553-3001-211)
Installation planning 553-3001-120